SAUD CORNERVIEW ESTATE

Behind Conoil Sabon Lugbe, Airport Road FCT Abuja

foundation.jpg

FOUNDATION

The foundation was effectively excavated with the help of excavating machines as per the building dimension specified in drawings. In this foundation trench, a layer of PCC (Plain cement concrete) is laid in the dug portion before placing the reinforcements. After the PCC work foundation reinforcement work is started. The foundation bottom level was checked before concreting it. The remaining space between the foundation is filled with earth.

flyer wall2.jpg

WORK IN PROGRESS

After the foundation work is done ground beam formwork preparation is started and poured with concrete. Over the plinth beam, masonry work is started. And space between foundation and plinth beam filled with soil. The lintel is constructed on the door and window to support the masonry work over it.

IMG_20200724_145008.jpg

The Lintel Over Door Window Gaps

The lintel was constructed on the door and window to support the masonry work over it. 

VIEW MORE
2348033371896_status_b442e3cc5a444586a1c

Decking Construction

For this stage, we used the total floor area in cubic meters since there is a depth to it. The floor is 6 inches (150 mm) thick. The total cubic meter for the used floor plan is 39.6 cubic meters. Hence, the cost of the reinforced concrete floor slab with ratio 1:2:4 

2347060656337_status_bf616c87701348ccad4

ROOFING 

Sheet metals were Properly installed. As it resists wind forces, (and possible blow-offs) and provides a weather-tight seal at the building’s perimeter.

VIEW MORE
IMG-20200703-WA0031.jpg

PLASTERING, PLUNBERING AND WIRING

Plumbing and electrical were done before plastering. They run the wires up the wall to where the power points go, then place the gyprock on the wall and mark where the wire is.

As we know that buildings are constructed with a clean finish in which electrical and plumbing work is not visible. They were  installed in the walls and slabs such that they are concealed and not visible after the finishing work is done. The point and pipe end left out such that later they can be finished with the electric fitting and plumbing fixtures

VIEW MORE
IMG_20210301_114030.jpg

Exterior Finishing

External plastering and finishing work was done. Waterproofing was also done to prevent rising dampness in the wall. External cladding was done to enhance the elevation of the house.

Terrazzo tiling was done to prevent the slab from a weathering effect.

VIEW MORE
IMG_20210301_113357.jpg

Internal Finishing

Internal walls are plaster with smooth finish and flooring is done with tiles, and the walls are painted & textured.

Composite Decking Slabs
Composite Decking Slabs

The suspended slab is achieved with metal sheets, aluminum, hard wood, concrete, synthetic fibres and Marine boards

press to zoom
Room Interior
Room Interior
press to zoom
Meeting with Clients to discuss Infrastructure
Meeting with Clients to discuss Infrastructure
press to zoom
Arrival of trailer of cement
Arrival of trailer of cement
press to zoom
Meeting with Clients day 2
Meeting with Clients day 2
press to zoom
Meeting with Clients day3
Meeting with Clients day3
press to zoom
POP Interior design
POP Interior design
press to zoom
Standard German floor
Standard German floor
press to zoom
Cross View of the 5bedrrom Duplex
Cross View of the 5bedrrom Duplex
press to zoom